Previous Page  8 / 8
Information
Show Menu
Previous Page 8 / 8
Page Background

110 VOLT TRANSFER

SWITCH INSTALATION

November 6, 2017

Page

8

of

8

BC Ambulance Service, Fleet Operations

1 877 652-7465

Block C, 2261 Keating X Road

Fax: 250 952-0275

Step 6

Re-install the Breaker Box Cover and

tighten all mounting screws.

System Test:

Using a GFI protected circuit; plug a shoreline power cord into the lower 110V shore power receptacle

on the outside of the ambulance.

Plug an 110V tester into each of the patient compartment 110 volt outlets – power should be present.

Note:

There is a second outlet located in the kit tree.

Start the engine and turn the connect switch on. Unplug the shore power from the outside of the

ambulance.

Confirm the 110V outlets in the patient compartment still have power.

Labour Code: GMOTS – use this labour code on the invoice and charge 1.5 hrs.

Step 7

In the patient compartment, remove the lower

box labeled “Inverter Power”. Pull the power

cord wire out with the box and recycle both.

Install supplied hole plug with silicone.

Use a razor blade to trim and peel the

remaining box decal to read:

Power 110 Volt AC