1 / 7 Next Page
Information
Show Menu
1 / 7 Next Page
Page Background

110 VOLT TRANSFER

SWITCH INSTALATION

November 6, 2017

Page

1

of

7

BC Ambulance Service, Fleet Operations

1 877 652-7465

Block C, 2261 Keating X Road

Fax: 250 952-0275

AMBULANCE TYPE:

CRESTLINE DUAL STRETCHER

UNITS AFFECTED:

ALL CRESTLINE DUAL STRETCHER UNITS EQUIPPED WITH

THE STRYKER POWERPRO STRETCHER

ISSUE:

To provide 110V power to the internal receptacles of the ambulance

from shoreline power or the Go Power inverter, to facilitate charging of

the Stryker PowerPro Stretcher battery.

ACTION:

INSTALLATION OF AN 110 VOLT TRANSFER SWITCH

LABOUR TIME:

1.5 hrs

LABOUR CODE:

GMOTS

SERVICE PROCEDURE:

Read these instructions entirely before starting the modification.

Contact BCAS Fleet Operations if there are any questions or concerns.

1-877-652-7465

Check contents of kit provided.

2 Marrets - 110V connectors

1 female 110V plug

4 #10 x 5/8 self-tapping screws

2 cable clamps

3 Zap straps

1 Transfer Switch

BEFORE STARTING THIS MODIFICATION:

Confirm the 110 volt shoreline power is not connected to the ambulance, and

the vehicle engine is switched off.