

110 VOLT TRANSFER
SWITCH INSTALATION
November 6, 2017
Page
1
of
8
BC Ambulance Service, Fleet Operations
1 877 652-7465
Block C, 2261 Keating X Road
Fax: 250 952-0275
AMBULANCE TYPE:
DEMERS SINGLE STRETCHER
UNITS AFFECTED:
UNITS 62801 to 62899 EQUIPPED WITH THE STRYKER
POWERPRO STRETCHER
ISSUE:
To provide 110V power to the internal receptacles of the ambulance
from shoreline power or the Go Power inverter, to facilitate charging of
the Stryker PowerPro Stretcher battery.
ACTION:
INSTALLATION OF AN 110V TRANSFER SWITCH
LABOUR TIME:
1.5 hrs
Add .3 if component relocation is necessary.
LABOUR CODE:
GMOTS
SERVICE PROCEDURE:
Read these instructions entirely before starting this modification.
Contact BCAS Fleet Operations with any questions.
1-877-652-7465
Check the contents of the kit provided.
2 Marrets - 110V connectors
6 #10x5/8 self-tapping screws
2 #10-32 x 5/8 cover screw
2 cable clamps
1 Bus bar with #10-32 x 5/8 screw
2 #10-32 x 3/4 cover screws
1 mounting bracket – Demers
1 Transfer Switch
BEFORE STARTING THIS MODIFICATION:
Confirm the 110 volt shoreline power is not connected to the ambulance, and
the vehicle engine is switched off.