Previous Page  7 / 7
Information
Show Menu
Previous Page 7 / 7
Page Background

110 VOLT TRANSFER

SWITCH INSTALATION

November 6, 2017

Page

7

of

7

BC Ambulance Service, Fleet Operations

1 877 652-7465

Block C, 2261 Keating X Road

Fax: 250 952-0275

System Test:

Using a GFI protected circuit; plug a shoreline power cord into the lower 110V shore power receptacle on

the outside of the ambulance.

Plug an 110V tester into both patient compartment

white

110 volt outlets and confirm power is present.

Note:

The second white 110 volt outlet is located in the equipment kit tree.

Power should not be present at the orange inverter outlet at this time.

Start the engine and turn the connect switch on. Unplug the shoreline power from the outside of the

ambulance.

Confirm power is still present at both the

white

and

orange

110V outlets inside the patient compartment.

NOTE:

The orange outlet is inverter power only and will only have power when the vehicle is running and

the connect switch is on.

Use a razor blade to trim and peel the decal below the

white

outlet to say “115 VOLT AC -15 AMPERE”

Labour Code: GMOTS – use this labour code on the invoice and charge 1.5 hrs