1 / 7 Next Page
Information
Show Menu
1 / 7 Next Page
Page Background

110 VOLT TRANSFER

SWITCH INSTALATION

November 6, 2017

Page

1

of

7

BC Ambulance Service, Fleet Operations

1 877 652-7465

Block C, 2261 Keating X Road

Fax: 250 952-0275

AMBULANCE TYPE:

DEMERS SINGLE STRETCHER

UNITS AFFECTED:

UNITS 62911 to 62979 EQUIPPED WITH THE STRYKER

POWERPRO STRETCHER

ISSUE:

To provide 110V power to the internal receptacles of the ambulance

from shoreline power or the Go Power inverter, to facilitate charging of

the Stryker PowerPro Stretcher battery.

ACTION:

INSTALLATION OF AN 110V TRANSFER SWITCH

LABOUR TIME:

1.5 hrs

LABOUR CODE:

GMOTS

SERVICE PROCEDURE:

Read these instructions entirely before starting this modification.

Contact BCAS Fleet Operations if there are any questions or concerns.

1-877-652-7465

Check the contents of the kit provided.

2 Marrets - 110V connectors

4 #10x5/8 self-tapping screws

2 cable clamps

1 Bus bar with 1 #10-32x3/4 screw

1 Transfer Switch

BEFORE STARTING THIS MODIFICATION:

Confirm the 110 volt shoreline power is not connected to the ambulance, and

the vehicle engine is switched off.