

Crestline Ambulance 110V Shoreline Plug Upgrade
August 10, 2016
Page
2
of
3
BC Ambulance Service, Fleet Operations
1 877 652-7465
Block C, 2261 Keating X Road
Fax: 250 952-0275
5)
6)
7)
8. Place the new 110v shoreline plug assembly into the existing hole in the ambulance with the cover
door flap hinge-pin pointing to the front of the vehicle.
9. Using the appropriate size drill bit, drill the 4 mounting screw holes on the side of the ambulance
10. Secure the shoreline plug to the ambulance body using the retaining screws from the old shoreline
plug (Note: use a dab of RV silicone on the 4 retaining screws before installing)
Labour Time: .4 hr each
Front